LG Neon2
x19

Next up: electrical inspection, followed by waiting for the Dominion to arrive and overwhelm the defenses and assume control of the station swap out the meter then provide our ATO

[ETA - the installer is a relatively small company so there's some amount of miscommunication that has to be allowed for. Just got a call from their scheduler about moving the county inspection from next Monday to Tuesday due to the county observing President's Day. This follows a Google calendar invite from him yesterday evening scheduling the inspection for March 1st, along with critter guard installation.

So now we'll keep both days - next Tuesday for inspection, Mar 1st for critter guard, and since the inspection is a load bearing dependency to getting the meter swapped this hopefully moves up the ATO by two weeks.

Yay!]
Tags:
.

Profile

curvemudgeon: (Default)
curvemudgeon
Powered by Dreamwidth Studios

Style Credit

Expand Cut Tags

No cut tags